5.
Measure across 25.25 in. (Critical Dimension) from plumb line & mark
location.
6.
Mark a plumb line on the wall down 72 in. from shelf.
Level across & mark the 3 in., 35 in. & 67.5 in. locations on line.
7.
8.
At the 3 in., 35 in. & 67.5 in. marks, center the middle hole of the tower
bracket & mark bracket hole locations (bracket flanges are positioned
towards tower inside).
9.
Secure tower bracket to wall using #8 1 1/2 in. screws.
10. Repeat at all bracket locations.
5
11. Position tower sides with grooves facing up.
12. Locate cam bolt positions at bottom of tower sides.
13. Secure cam bolt into pre-pilot hole at location.
14. Repeat for 2nd location & 2nd tower side.
15. Select tower bottom shelf (typically the logo shelf).
16. Insert cam nut with arrow facing toward bolt hole.
17. Repeat for each location.