Climit 24 HE Plus Manual De Instalación Y Mantenimiento página 116

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

a
WARNING
Before carrying out any interventions described:
– set the main system switch to "OFF"
– close the gas valve
– make sure that no hot parts inside the appliance are
touched.
To facilitate introduction of the connection wires of the optional
components into the boiler:
– remove the screws (1), pull the front panel (2) forwards and
release it from the top by lifting it
2
– remove the screws (3) securing the control panel (4)
– move the panel (4) upwards (a) but keeping it in the side
guides (5) to the end of travel
– bring it forwards and down (b) until it is horizontal
4
b
116
OFF
1
a
3
– insert the connection wires into the cable gland (6) and the
opening (7) on the control panel
6
7
Fig. 17
– bring the control panel (4) to the original position and secure
it with the screws (3) which were removed previously
– connect the component wires to the terminal board (8)
following the indications provided on the data plate (9).
4
9
8
TA
SE
Fig. 18
m
CAUTION
It is compulsory:
– to use an omnipolar cut-off switch, disconnect
switch, in compliance with EN standards (contact
opening of at least 3 mm)
– if the power cable is to be replaced, that ONLY
a special cable is used with a factory produced
re-wired connector, ordered as a spare part and
connected by a professionally qualified person
– to connect the earth wire to an effective earthing
system (*)
– that before any intervention on the boiler, the mains
power is disconnected by setting the main system
switch to "OFF".
(*) The manufacturer is not responsible for any damage caused
by failure to earth the appliance or failure to observe the
information provided in the wiring diagrams.
5
Fig. 19
6
5
4
3
2
3
1
EN
Fig. 20
Fig. 21

Publicidad

Tabla de contenido
loading

Tabla de contenido