Installing The Switch In An Equipment Rack - Nortel Networks Business Policy Switch 2000 Instrucciones Para La Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

10

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch
Rack requirements:
A space of 2.8 inches is provided for each switch in an EIA or IEC standard 19-inch
(48.2-centimeter) equipment rack.
The rack is bolted to the floor and braced if necessary.
The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 ohm of resistance from the rack to
the grounding electrode.
1
Attach a bracket to each side of the switch.
The bracket with the round holes goes on
the right side of the switch, where the
round fan vents are located.
Caution: Do not set a BayStack 10 Power Supply Unit on top of a Business Policy
Switch. The BayStack 10 Power Supply weighs approximately 100 pounds (45 kg), and
the switch housing is not strong enough to support this weight.
209319-A
9756FA
2
Slide the switch into the rack. Insert and
tighten the rack-mount screws.
9767FA

Publicidad

Tabla de contenido
loading

Tabla de contenido