Supply
Tube
Sleeve
Collar
8. Install the Tubing
Rough-Deck Installation Only
Thread the collars down the valve bodies so the exposed valve
height is correct for your installation.
Measure gap "X" as shown above.
Cut a copper tube to a length of X plus 1" (25 mm).
Insert the copper tube into the supply tube and tee.
Kohler Co.
Valve Height
2-1/16"
(52 mm) Max
1-13/16"
(46 mm) Min
Finished
Material
Thickness
X
X +
1" (25 mm)
11
1275145-2-A