13. Check for Leaks
Make sure a 3/8" pipe plug is securely installed in the supply
tube.
Open the hot valve by turning it fully counterclockwise.
Open the cold valve by turning it fully clockwise.
Check the complete installation for any leaks. Repair as needed.
1275145-2-A
16
Kohler Co.