Hygiene And Sanitization; Sanitary Issues - Pentair RIVERSOFT Guía De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
User Guide Riversoft
NOTE
Ensure that the serial label and the safety tags on the device are completely legible and clean. If
necessary, replace them with new tags and put them in the same places.
2.2.
Hazards
All the safety and protection instructions contained in this document must be observed in order to avoid temporary or
permanent injury, damage to property or environmental pollution.
At the same time, any other legal regulations, accident prevention and environmental protection measures, as well as any
recognized technical regulations relating to appropriate and risk-free methods of working which apply in the country and place
of use of the device must be adhered to.
Any non-observation of the safety and protection rules, as well as any existing legal and technical regulations, will result in a
risk of temporary or permanent injury, damage to property or environmental pollution.
2.2.1. Personnel
CAUTION
Only qualified and professional personnel, based on their training, experience and instruction as well
as their knowledge of the regulations, the safety rules and operations performed, are authorized to
carry out necessary work.
2.2.2. Transport
The following points must be observed to ensure proper operation of the system:
• do not lay down or flip over the softener at any time. The media may paste to the upper distributor thus obstructing its slots
or enter the valve and may therefore compromise the softener operation;
• pay attention not to hit the softener;
• use all the safety lifting systems to move the softener;
• do not lift the softener by the valve or bypass.
2.2.3. Material
The following points must be observed to ensure proper operation of the system and the safety of user:
• beware of high voltages present on the transformer (220-230VAC);
• do not put your fingers in the system (risk of injuries with moving parts and shock due to electric voltage).
2.3.

Hygiene and sanitization

2.3.1. Sanitary issues

Preliminary checks and storage
• Check that the brine tank and the brine well are clean and free from burr, debris or any scraps;
• check the integrity of the packaging. Check that there is no damage and no signs of contact with liquid to make sure that no
external contamination occurred;
• the packaging has a protective function and must be removed just before installation. For transportation and storage
appropriate measures should be adopted to prevent the contamination of materials or objects themselves.
Assembly
• Assemble only with components which are in accordance with drinking water standards;
• after installation and before use, perform one or more manual regenerations in order to clean the media bed. During such
operations, do not use the water for human consumption. Perform a disinfection of the system in the case of installations
for treatment of drinking water for human use.
NOTE
This operation must be repeated in the case of ordinary and extraordinary maintenance. It should also
be repeated whenever the system remains idle for a significant time.
NOTE
Valid only for Italy: In case of equipment used in accordance with the DM25, apply all the signs and
obligations arising from the DM25.
6 / 132
Ref. MKT-UG-045 / A - 13.03.2020

Publicidad

Tabla de contenido
loading

Tabla de contenido