Chapter III
Installation and operation
1. Tilt the equipment back to move it to the specified mounting position and secure the base to the floor with expansion screws
2. Connect the air supply to the oil-water separator and adjust the air supply pressure to 6-8Bar
3. Connect the power cable to 220V power supply
Panel operation:
1. Button function:
" - " : Decreases the target pressure value
" + " : Increases the target pressure value
"
": Tire pressure presetting button for motorcycles
"
": Tire pressure presetting button for passenger cars
"
": Tire pressure presetting button for SUVs
"
": Function setting and confirmation button
98107
1) Press the button with corresponding vehicle type icon. The target pressure value will be
displayed
2) Pull out the hose. Connect the chuck and inflating valve. Inflation will be carried out
automatically.
3) Inflation will be stopped automatically when the preset pressure is reached, and the
buzzer will sound to provide a reminder.
4) When the tire pressure is zero, press and hold "●" to manually activate the inflation
function.
5) If you need to adjust the inflation pressure value, press" +" or "-" button.
EN
DE
RU
KO
PT
JA
ES
15