Descargar Imprimir esta página

Barrette Xpanse BOM-34107756 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE:
13
Use 2" blocks to help hold the gate steady (Fig. 17).
Hold the gate level to the post (not included) and mark
to pre-drill. Pre-drill holes with
six 1
⁄ " screws (Fig. 18).
1
1
1
2
2
Using the glue, adhere the upright caps to the top of the
14
gate uprights, and repeat for all gate uprights (Fig. 19).
⁄ " bit and secure with
3
3
3
32
32
Fig. 17
2" Blocks
Fig. 18
Fig. 19
Upright Cap
Upright Cap
7

Publicidad

loading