Debug Method Instruction; Operation Instruction Of System; Parameters Setup Turnstile Wiring Diagram - Mach Power AC-ASDSC-017 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

is strictly prohibited.

Debug method instruction

1.
Preparation
1 copy of wiring diagram of swing barrier, 1 set of swing barrier device
2.
Check the wire connection
Check the wire connection according to the wiring diagram, ensure that all
the wire connection is all right. Thereafter, debugging can be starting.
The device must be earthing well, otherwise, debugging is not allowed.
3.
Function debug
1. The access gate is bi-directional swing barrier gate, which
going in or going out signal are acceptable.
2. The machine will alarm, if the pedestrian doesn't read a card on the card
reader. (Two directions included)
3. When card reader receives a valid signal, direction indicator will show a
green arrow and meanwhile the swing barrier gate will unlock for a short time,
Whether the pedestrian has passed through gate or not, the barrier gate will
automatically close in the pre-set time.
4. The tail is also allowed to pass in the pre-set time for opening.
5. Swing barrier's running speed is adjustable. Please refer to parameters setup
4.
Power on
1. The swing barrier is normal mode,automatically close when power on and auto-
matically open when power off.

Operation Instruction of System

Parameters Setup
1.
General description
1. Display refers to the three-digital LED on the main control panel.
2. From left to right, the three buttons are INC key, SET key, DEC key, SET key is
used in the Entry and Back menu or for the function setting of entry and
8

Publicidad

Tabla de contenido
loading

Tabla de contenido