Electric Installation; Pre Operation - Skymsen LC2 Manual De Instrucciones

Ocultar thumbs Ver también para LC2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.1.2 Electric Installation

This equipment has been designed for 110 or 220 V, when you receive the equipment
check the voltage given on the cord label.
The cord has a plug with three pins, the middle one is ground. It is mandatory the three
pins to be duly connected before to start the machine.
Make sure the network voltage is the same as the voltage indicated on the cord

2.2 Pre Operation

2.2.1 Placing the Cup
The Cup # 02 (Pic.01) has a simple system to fit it on his due place by an easy and safe way.
To remove and replace the Cup move it vertically up or down using the two handles.
Never remove or replace the Cup with the blender switched ON.
2.2.2 Placing the Lid
The Cup # 02 (Pic.01) has a non toxic rubber Lid # 01 (Pic.01) giving an efficient seal during
process Make sure the Lid to be duly fasted on the Cup, see picture 02 below.
8
IMPORTANT
label.
IMPORTANT
PICTURE 02

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Lc3Lc4Lc6Lc8Lc10

Tabla de contenido