Zoeller 1463-0006 Instrucciones página 44

Ocultar thumbs Ver también para 1463-0006:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WELL TO PUMP CONNECTION (SUCTION PIPE) - SHALLOW WELL
1. Attach ejector to face of pump with two (2) bolts
and gasket provided. Venturi tube on the ejector
inserts into the top tapping of the face of the pump
2. Make the connection to your well. Wrap all
threaded fittings with pipe tape 5 times or apply
a pipe paste (pipe dope) to ensure an air tight
connection.
The use of a union (optional) will assist with easy
connection and disconnect.
3a. NOTE: For drilled (cased) wells, a foot valve
is required in the well at the end of the pipe to
maintain prime.
3b. For driven wells, a check valve is required at the
top of the well to maintain prime. Flow arrow must
point toward pump.
1
Ejector
2
Glue
3a
Unions
3b
Flow Arrow
6
© 2020. All rights reserved.
Venturi
Tube
Slope pipe
upward
Pipe
support
Water level
Foot valve
Pump
IL2125

Publicidad

Tabla de contenido
loading

Tabla de contenido