Zoeller 1463-0006 Instrucciones página 6

Ocultar thumbs Ver también para 1463-0006:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. All piping from the well to the pump should slope
slightly upward with no sagging. Support suction
pipe between water source and pump. Unions in
the suction line near the pump and well will aid in
servicing. Be sure to leave enough room so that
wrenches can be used easily.
Replace foot valve for best performance.
WELL TO PUMP CONNECTION (SUCTION PIPE) - DEEP WELL
1. Make the connection to your well. Wrap all
threaded fittings with pipe tape 5 times or apply
a pipe paste (pipe dope) to ensure an air tight
connection.
2. Finish the connection to your well with additional
pipe and fittings as needed.
3
Water
Level
1
Tape
2
6
© 2020. All rights reserved.
Unions
Suction
Lift
Pipe
Support
Foot
Valve
IL1395
IL1

Publicidad

Tabla de contenido
loading

Tabla de contenido