4. Finish the connection to your well with additional
pipe and fittings as needed.
PUMP TO PRESSURE TANK CONNECTION (DISCHARGE PIPE)-SHALLOW WELL
1. Begin the connection to the pressure tank.
Install a 1 in. x 3/4 in. adapter (included)
to pump discharge. Using a 3/4 in. x 3 in.
galvanized nipple, wrap the threads 5 times with
pipe tape, apply pipe paste and install into the
adapter.
2. Install a 3/4 in. x 3/4 in. x 3/4 in. galvanized tee
fitting.
3. Install a 3/4 in. MPT x 1/4 in. FPT galvanized
bushing and pressure gauge (optional), or a
pipe plug. Do not tighten, as you will prime
your pump later at this location.
4
Water level
Foot valve
1
2
3
7
© 2020. All rights reserved.
Union
Slope pipe
upward
Pipe
support
IL2134