Installation Instructions - Greentouch 1328VA-24-241 Instrucciones De Ensamble Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Installation Time: 20-30 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, silicone caulk,
power drill with drill bit, measuring tape, level

INSTALLATION INSTRUCTIONS

Note: Clean area where the vanity (A) will be
permanently located prior to beginning installation,
ensure the vanity (A) will not interfere with any
water supply and drain lines once mounted.
1. With two people, carefully place vanity (A) with
(B) top against the wall in its final location.
Find and mark locations of wall studs behind
the permanent location of vanity (A).
From inside vanity (A), drill holes through vanity
mounting area and into wall studs. Using
mounting hardware (not included) appropriate
for your installation site, secure vanity (A) to wall
stud. If possible, secure vanity (A) to two wall
studs for increased stability.
Note: Use preassembled levelers on legs of
vanity (A) to level the item. Twisting the
levelers counterclockwise will increase the
height of vanity (A), twisting them clockwise
will decrease it.
Note: The stone top can be removed from the
wood cabinet. Locate the screws under the top
and use a phillips head screw driver to remove.Once the screws are removed, with the help of
another adult carefully lift the stone top with sink straight up. Place the stone top onto a scratch free
surface such as the packaging material included with the vanity.
WARNING
Vanity (A) MUST be secured to wall.
1
1
3
3
2
B
A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0554871

Tabla de contenido