Assembly; Electrical Requirements - DOLE yonanas Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY

ASSEMBLE CHUTE
1. Place bottom of gasket into the bottom cap.
TOP 3-3/4"
9.5 cm
BOTTOM 4-1/4"
10.8 cm
NOTE:
There is a top and bottom to the
gasket. The top measures 3-3/4 inches
and the bottom measures 4-1/4 inches.
The gasket fits snuggly in the bottom cap.
2. Carefully set the blade cone on the
gasket.
Always insert gasket
into cap before
screwing cap into
the blade cover.
3. Screw bottom cap into
the chute and blade cover.
ELECTRICAL REQUIREMENTS
1. Power Switch
2. Electrical Cord
Do not use an extension cord. If the
cord provided is too short, move the
appliance closer to an outlet. Place
bowl in front of unit underneath spout.
www.yonanas.com
BOTTOM 4-1/4"
10.8 cm
TOP 3-3/4"
9.5 cm
PLACE & LOCK CHUTE
TO BASE
4. Place chute assembly on base.
Interlocking mechanism in base
prevents motor from running when
chute assembly is not in place.
5. Rotate counterclockwise until chute
assembly clicks into the locked position.
2
1
3

Publicidad

Tabla de contenido
loading

Productos relacionados para DOLE yonanas

Tabla de contenido