Instruction Manual
8.
ELECTRODE INSTALLATION
NOTE: numbers shown below are referring to Fig. 1-2-3-4-5-6 of
chapter 6 COMMANDS DESCRIPTION to page 7.
8.1
FILLING UP THE COOLING RESEVOIR.
1.
Make sure that the switch (11) is in position "0".
2.
Unscrew Cap (22) and pour the coolant until the MAX
level indication is reached (21).
Warning! When working with the cooling unit, it
should exclusively be used the coolant supplied by
Sol Welding.
3.
Screw cap (22) back on.
Warning! If the water cooling torch is not connected, the
"bypass" tubes (19A) should be connected to the rapid
links (4).
8.2
ELECTRODE HOLDER CONNECTION.
1.
Connect the positive power cable (+) of the
ELECTRODE HOLDER to socket (5).
2.
In case reverse polarity electrodes are used, connect
the ELECTRODE HOLDER to socket (9).
Negative polarity (-).
8.3
CONNECTION TO BASE MATERIAL
1.
Connect the ground cable to socket (9).
Negative polarity (-).
2.
Secure the other end of the ground cable to the base
material, making sure that a good electrical contact is
established.
3.
In case reverse polarity electrodes are used, connect
the ground cable to socket (5).
Positive polarity (+).
HOT START: improves the start, during the arc starting procedure,
the current increases in percentage its value for 0,3 sec.
ARC FORCE: improves the stability of the arc during welding, the
current increases automatically during the transfer of the material.
ANTISTICKING: after 2 sec. of short circuit between the electrode
and the base material, the generator turns OFF.
Hot Start
Welding Current
0,3 sec
Start
QUAD AC/DC SERIES
In ELECTRODE mode,consider that
functions:
HOT START
ARC FORCE
ANTI STICKING
are all automatic and pre-set for the
electrode that needs to be welded.
In case of special uses the
HOT START and ARC
FORCE data can be
adjusted to the electrode's
specifications.
GB
15
GB