Assembly Step 7
Firebox
M6 x 12 Bolt
Cut the zip ties securing regulator and hose to underside of firebox. Allow hose to hang straight down when
lowering firebox onto cart.
Position firebox onto cabinet. Open hood and use 4 of the M6 x 12 bolts to secure firebox into position. Be
sure that edges of firebox are even with edges of cart before tightening bolts.
Note: Attachment holes are located on inside of firebox (2 on each side).
Note: Two people are required to lift firebox into position.
13