ASSEMBLE - TOWER
STEP 9 - STEEL CABLE ADJUSTMENT
17
NAME
Cable tensioner
N
NAME
Steel cable
F
NAME
Steel cable
18
NAME
Low profile hex nut
M8
THE RIGHT ASSEMBLE POSITION OF
THE CABLE TENSIONER (17), IS
INDICATED BY THE FRIEZE PLACED IN
ITS EXTREMITY. (Figure 9-3)
CAREFUL TO NOT PASS THE CABLE UP
THE SCREW, IF IT HAPPENS THE CABLE
WILL BE DAMAGED IN THE USE OF THE
EQUIPMENT. (Figure 9-4).
THE CABLE SHOULD BE ADJUSTED AS
QTY
1x
DESCRIBED IN THIS MANUAL AND
CHECKED DAILY TO NOT SCAPE
FROM THE TENSIONER, AVOIDING
POSSIBLE INJURIES TO THE USER.
QTY
1x
N
17
18
F
Figure 9-1
Figure 9-3
FRIEZE
Figure 9-5
X cm
The same distance
of the cables in the
tensioner, the cables
should be put at
the same
time.
X cm
24
Figure 9-2
To regulate the
steel cable tighten
or slack the
tesioner (24).
N
17
17
18
18
F
Figure 9-4