KEY
CLAMP DESCRIPTION
Room thermostat
21-22 TASRP
o
TADSRP
S6 SUW
Antifreeze probe
S5 BP
Low pressure switch
S4 AP
High pressure switch
PT1000 probe
S3 SSMC
NTC probe
S2 SS
S1
Common
Common
Outside air temperature probe
26
Ba
Common
25
Arms probe
29
Bv
Common
25
Water temperature return probe
30
Bps
system
Common
25
32
Bww
DHW temperature probe
25
Common
2-3* EVU
Power supply switch
6 RPSP
Pump primary
DHW storage resistance
7 MTRS
Secondary pump (MK)
9 RPMK
Deflector valve
15 Rpww
C1 VIC
Reverse cycle pump
C3 CP
Compressor
C5 MV
Fan
Machine resistance
C4 RI
C2 SIC
Safety chain
C6 VS
Solenoid valve
C8 F
PHASE
NEUTRAL
C9 N
VA
G.ca
ACCESSORY
supplied without connection cable
Yellow signal cable n°6 - Clamp
Yellow signal
Yellow signal cable n°5 - Clamp
Yellow signal
Yellow signal cable n°4 - Clamp
Yellow signal
Yellow signal cable n°3 - Clamp
Yellow signal
Yellow signal cable n°2 - Clamp
Yellow signal
Yellow signal cable n°1 - Clamp
Yellow signal
Supplied without connection cable
PLACED INSIDE THE TECHNICAL
ROOM CONTROL BOARD
Supplied without connection cable
LACED INSIDE THE TECHNICAL
ROOM CONTROL BOARD
PT1000 PROBE, supplied with a
4 m cable. PLACED INSIDE THE
TECHNICAL
ROOM
CONTROL
BOARD
Probe supplied with a 4 m cable.
PLACED INSIDE THE TECHNICAL
ROOM CONTROL BOARD
With jumper
ACCESSORIY
supplied without connection cable
Red control cable n°1
Red control cable n°3
Red control cable n°5
Red control cable n°4
Red control cable n°2
Red control cable n°6
POSITION
A shielded cable is advised for internal
use . For further information see page
23 or the instructions of the accessory
To the SRP board yellow terminal board
To the SRP board yellow terminal board
To the SRP board yellow terminal board
To the SRP board yellow terminal board
To the SRP board yellow terminal board
To the SRP board yellow terminal board
For a correct functioning of the SRP unit,
the probe must be positioned north of
the building, at a height of 2/3 and must
not be sheltered by windows or gutters.
lts connection cable should be placed in
a cable trough, see page 23
The probe should be positioned on the
delivery towards the heating terminals
The probe should be positioned on water
return towards the SRP
The probe should be positioned inside
the DHW storage tank
Only for the German market
Pump not supplied
The resistance should be positioned
inside the DHW storage tank inside its
seat, see supplementary resistance
accessories
Pump not supplied
Valve not supplied
To the SRP board red terminal board
To the SRP board red terminal board
To the SRP board red terminal board
To the SRP board red terminal board
To the SRP board red terminal board
To the SRP board red terminal board
not supplied
not supplied
9