Kohler K–16213 Guia De Instalacion página 3

Ocultar thumbs Ver también para K–16213:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
8" (20.3 cm)
4" (10.2 cm)
Bath/Shower Installation
72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
48" (122 cm) to Floor
Shower Installation
1. Install the Valve - Floor Supplies
CAUTION: Risk of product damage. Remove the thread
protectors, valve units, and aspirator before applying heat to the
yoke.
Determine the location of the support framing for the yoke,
spout, and the showerhead.
Install the support framing as needed.
The yoke has two union joints that can be used with either 1/2"
N.P.T. pipe or copper tubing.
Connect the hot and cold supplies to the yoke. They should be
2-1/4" (5.7 cm) minimum and 3" (7.6 cm) maximum from the
finished wall.
Reinstall everything that was removed before soldering.
Kohler Co.
2-1/4" (5.7 cm)
Min.
3" (7.6 cm)
Max.
Union
Joints
1/2" NPT Pipe or
Copper Tubing
3
Finished
Wall
Thread
Protector
Valve Units
1025256-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-16214K-16217

Tabla de contenido