Saneo JHS-A19-07KR2/E Manual Del Usuario página 44

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
It is important that the instructions below are respected to successfully install this portable air
conditioner. If you have any difficulties or questions regarding these installation procedures,
please contact the customer service department.
Before installation:
IMPORTANT – before installing and operating the air conditioner, keep the unit upright for at
least 2 hours.
Installation of the drain pipe
- Insert the drain pipe (the end of the drain joint ) into the ventilation slot on the rear panel (push
to the left, as shown in the diagram below)
Installation of the window kit
-
Open the window halfway and install the window kit as shown in the diagrams below. The
kit can be installed horizontally or vertically.
-
The flat end of the drain pipe connections must be clipped into place.
-
Do not twist or block the drain pipe.
-
The length of the drain pipe is 280mm at most and can extend to 1500mm. Do not use
extension cords or other replacement hoses as this may cause malfunction. The drain pipe must
not be blocked, otherwise it may cause overheating.

Publicidad

Tabla de contenido
loading

Productos relacionados para Saneo JHS-A19-07KR2/E

Tabla de contenido