Front Runner FAJK007 Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREP AND INSTALLATION OF FOOT RAILS (FAJK006)
3
3.1
FRONT OF VEHICLE
3.2
Front Of Vehicle
3.3
FAJK007 / FAJK008_REV_C00
4
SIDE VIEW OF FOOT RAIL
TOP VIEW OF FOOT RAIL
Mark Front Holes
REAR FOOT
10mm
4mm Pilot Holes
10mm
6mm
22mm
5
Place the Foot Rail on the roof and align
the rear slots of the Foot Rail centre with
the holes drilled in 2.3.
Align the Foot Rail with the rib on the roof
so that it runs parallel with the rib before
marking the two front holes.
Mark the position of the two front holes of
the Foot Rail onto the outside of the roof.
Remove the rail and from the outside, drill
4mm pilot holes on the marks just made.
Do this on both sides of the vehicle.
Using the Foot Rail as a template check that
all four holes are centered in the slots of the
Foot Rail.
Change the 4mm drill bit to a 22mm hole
saw. From the outside of the vehicle, drill all
the 4mm holes (8 in total) out to 22mm.
Let the drill do the work. You do not want to
scratch or damage your vehicle's roof. Have
your friend hold the vacuum cleaner
underneath where you are drilling to catch
all the dust and keep your vehicle clean.
After drilling, clean the area around all the
22mm holes in the roof with a rag and
methylated spirits/denatured alcohol.
© 2020 FRONT RUNNER VEHICLE OUTFITTERS
13mm

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fajk008

Tabla de contenido