BONAIRE PORTABLE COOLER
Installation
Startup Checklist
•
Position the cooler as required and lock all of the wheels.
•
Check that another door or window in the room is open to allow air to exhaust to other parts of the
house.
•
Turn the water supply to the cooler on if hose connected or fill the tank with water.
•
Plug the cooler into a 110V 60Hz single phase grounded appliance socket and switch the socket
on.
•
Turn the unit on to FAN mode and check the operation of the three speeds fan.
•
Rotate the control knob to COOL mode and operate the three speed fan and pump.
•
Leaving the unit in the COOL mode, check that a constant small stream of bleed off water is coming
from the overflow tube if unit is outside. This bleed off is designed to reduce mineral build up on
the Filtercool filter pads.
•
You may notice a wet paper smell as the water circulates around the filter pads. This is normal
during the commissioning phase and at the beginning of each season when the unit is operated
after the winter break. It will only last for a short time.
Page | 9