Helpful Hints For Easy Installation
1. Read all instructions before beginning installation.
2. Be sure the floor is level within 1/8" (3 mm).
3. Install vent pipe seal with flange side of seal on outside of lid.
4. Use soapy water to lubricate all seals to aid
installation.
5. Install rubber coupling/union in vent line to aid disassembly.
6. Do not over torque toilet mounting screws.
7. Do not use an automatic plumbing vent device.
8. Obtain model number and date code, and record information
in the space provided on the front of this manual. Refer to this
information when calling factory.
8' (2.4 m) CEILING
7' (2.1 m) CEILING
8" (203 mm)
MIN
Typical Piping Configurations
NOTE: All installations must comply with all applicable Electrical
and Plumbing Codes, including, but not limited to,
Electrical Code, Local, Regional and/or State Plumbing Codes, etc.
Installation may not
be exactly as shown.
SUBFLOOR 3/4" (19 mm)
THICK MINIMUM.
2" x 8" (51 x 203 mm)
FLOOR JOISTS
© Copyright 2017 Zoeller
Co. All rights reserved.
®
3
Do's And Don't's For Installing A Unit
1. DO read all installation material with the unit.
2. DO inspect unit for any visible damage caused by shipping.
Contact dealer if unit appears to be damaged.
3. DO clean all visible debris from the unit.
4. DO always disconnect pump from power source before handling.
DO always connect to a separately protected and properly
grounded ground fault protected circuit. DO NOT ever cut, splice
or damage power cord. DO NOT carry or lift pump by its power
cord. DO NOT use an extension cord.
5. DO install a ball or gate valve and a union in the discharge line
downstream of the check valve.
6. DO test pump immediately after installation to be sure that the
system is working properly.
7. DO review all applicable local and national codes and verify that
the installation conforms to each of them.
8. We DO NOT recommend this product be connected to utilities
other than those found in a normal bathroom application. Washing
machines and dishwashers are examples of equipment that we
DO NOT recommend.
9. DO inspect and test system for proper operations at least every
3 months.
National
CHECK VALVE
P/N 30-0181
SK2587