Location Selection - Zoeller QWIK JON ULTIMA 202 SYSTEMS Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Qwik Jon
STEP 1
Plan your new installation carefully.
Floor: The floor should be structurally sound
and level within 1/8" (3 mm). If the floor is not
level, use hydraulic cement or similar material
to level the floor.
Water: A water supply will be needed to
operate the toilet. Usually a 1/2" (DN15) line
with a shut-off valve is sufficient.
Electrical: A 115 volt GFCI or RCD receptacle
will be needed to supply electrical power to
the pump.
Sewage: Access to a sewage line is required.
The Qwik Jon
Ultima requires a 1" (DN25)
®
[or 3/4" (DN20) if your codes permit] sewage
discharge line to connect to an existing sewage
line. A ball or gate valve should be installed in
the discharge line.
Vent: Access to a vent pipe is required. The
use of a mechanical vent system is NOT
recommended as the toilet will not flush.
NOTE: If a built-in installation is to be used,
locate the pump unit in an area that will allow
access to the pump and switch.
STEP 2
Do not use wooden shims to level the pump unit!
CAUTION
Ensure that nails, screws or other sharp objects do
CAUTION
not puncture the pump unit!
Level the pump unit to within 1/8" (3 mm) using hydraulic cement
or similar material.
Ultima Qwik Reference Guide
®

Location Selection

Leveling of Pump Unit
© Copyright 2017 Zoeller
DISCHARGE
PIPE
GFCI
OUTLET
WATER
SUPPLY
Co. All rights reserved.
®
6
VENT
PIPE
BALL OR GATE VALVE
SOLD SEPARATELY.
LEVEL FLOOR
SK2588
SK2589

Publicidad

Tabla de contenido
loading

Tabla de contenido