Suzuki 34200-96L2 Serie Manual De Instalación página 23

Ocultar thumbs Ver también para 34200-96L2 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Some of the items in Initial Setting may be important
during the initial setting. A confirmation screen to
draw your attention will be displayed.
After install the gauge, turn on the power and perform
the following set up procedure for the gauge.
● Menu screen
• MENU button operation
• SET button operation
buttons operation
● Initial Setting
:
:
:
Set up unit and scale
of analog speedometer
→ P24
Set up the time, display,
nondisplay, 12-24 hour
and time zone → P25
Set up Gauge Position,
1st or 2nd → P27
Set up engine number
and position
Engine Setting → P28-31
Engine Serial No. → P32
Set up Water Speed
Sensor, Trim Sensor
and trim Sender → P33
Set up Tank Capacity
→ P36
Set up Tank Calibration
→ P38
Tank Reset → P41
23

Publicidad

Tabla de contenido
loading

Productos relacionados para Suzuki 34200-96L2 Serie

Tabla de contenido