Kohler K-705800 Guia De Instalacion página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Top Drill
Template
Inside of
Shower
#8 x 1/2"
Panhead Screw
8. Install the Pin Block and Bushing
Secure the Pin Block
Insert the top drill template into the pin block.
Slide the template with the pin block flush against the side panel.
IMPORTANT! Use the bottom holes of the top drill template for this installation. Do not drill through the
side holes of the template.
Hold the top drill template and pin block in place. Using one of the bottom hole guides, drill a 1/8"
hole into the underside of the header.
Remove the template and secure the pin block to the header with a #8 x 1/2" pan head screw.
Reposition the top drill template into the pin block and drill the second 1/8" hole into the underside
of the header.
Remove the template and secure the pin block to the header with a #8 x 1/2" pan head screw.
Install the Bushing
Place the bottom drill template over the threshold and flush against the side panel.
IMPORTANT! Drill only into the top surface of the threshold. Do not drill through the bottom of the
threshold.
Hold the template in place and drill a 3/8" hole into the top of the threshold.
Use a rubber mallet to tap the metal bushing into the drilled hole.
1144162-2-B
Pin Block
Bottom Drill
Template
Drill through top only.
12
Bushing
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido