Descargar Imprimir esta página

cascade corporation 20G-77G Instrucciones De Instalación página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
I
NSTALLATION
Adjust Relief Cartridges (continued)
Sideshift Relief Adjustment (internal SS only)
A
Clamp a maximum load and sideshift LEFT and
RIGHT observing sideshifting movement:
• If Clamp will not sideshift or sideshifts slowly, adjust
SIDESHIFT relief clockwise (CW) until Clamp
sideshifts, then go to Step J.
• If Clamp will not sideshift after attempted relief
adjustment, proceed to following Step G.
B
Locate the cap plug stamped 'OR' on top of valve and
remove interior setscrew plug (4 mm Allen socket) to
open clamp line equalization orifice.
C
If valve does not have an 'OR' port, install a new valve
with the equalization circuit, or install an external
equalization connection between CLAMP/OPEN lines.
Refer to Service Kit 212863 (includes Installation
Sheet 212862) or TB 167.
D
Adjust the SIDESHIFT relief cartridge
counterclockwise (CCW) 1/4 turn increments until
sideshift speed slows (relief opening). Finish by
adjusting cartridge clockwise (CW) 1/4 turn. Tighten
jam nut.
8
Clamp
Supply
SIDESHIFTING VALVE
RH CLAMP Ports
B
Equalization
Orifice Plug
(4 mm Allen
socket)
Sideshift
Supply
D
Sideshift
Relief
Cartridge
Sideshift
Front of
Supply
Attachment
Decrease
Increase
(CCW)
(CW)
D
CL3917.eps
SIDESHIFTING VALVE
LH CLAMP Ports
6033701-R6 EN
Clamp
Supply

Publicidad

loading