Fig A:
1
Floor covering (can be tile or natural stone)
2
Tile glue
3
(Waterproofing layer – optional for shower areas)
4
(Filler material – Optional)*
5
QuickNet + Floor sensor inserted in sensor tube
6
Primer (optional)
7
Sub floor
8
Insulation
9
Bearing construction
Fig B:
1
Floor covering (can be tile or natural stone)
2
Tile glue
3
(Waterproofing layer – optional for shower areas)
4
(Filler material – Optional)*
5
QuickNet + Floor sensor inserted in sensor tube
6
Primer (optional)
7
Gypsum plasterboard ≥13mm
8
Wooden plate
9
Joist and insulation layer between the joists
Fig C:
1
Floor covering (Parquet floor)
2
Glue
3
(plywood – Optional)
4
Filler material (between 15 and 30mm of filler material)
5
QuickNet + Floor sensor inserted in sensor tube
6
Primer (optional)
7
Sub floor
8
Insulation
9
Bearing construction
6 | nVent.com/RAYCHEM