Finished Wall
Material
1/2" Cement
Board
Galvanized
Nails or Screws
13. Complete the Finished Wall
CAUTION: Risk of product damage. Use care to avoid scratching the wall jambs.
NOTE: The total finished wall thickness, including furring strips, cement board, and finished wall material
must not exceed 1-1/2" (3.8 cm).
Install cement board. Position the cement board so the gap above the top of the footbath rim is no
larger than 1/4" (6 mm).
Apply a bead of silicone sealant to the seam between the cement board and the footbath.
Install the finished wall material.
Use a sharp utility knife to carefully remove the protective tape from the wall jambs.
1032110-2-E
1-1/2" (3.8 cm) Max
Furring Strip
Bead of Silicone
Sealant Between
Cement Board and
Footbath
14
1/4" (6 mm)
Max
Kohler Co.