U
I
S
2.4
Side opening
-
On the left-hand side lift the cover that protects the
screw, loosen the screw that fixes the left panel, then
move it slightly to the left and lift it up.
-
On the opposite side, lift the cover that protects the
screw and unscrew it.
cover
A
fixing screws
B
2.5 Wall or vertical floor installation
When mounting on the floor with support feet, refer to the
Vertical floor or wall installation
individual instructions leaflets supplied and the relative
manual for the mounting of the feet.
Using the paper template, trace the position of the two
fixing brackets on the wall. Use a suitable drill to make the
holes with and insert the toggle bolts (2 for each bracket);
fix the two brackets. Do not over-tighten the screws so
that the brackets can be adjusted with a spirit level.
Fully tighten the four screws to block the two brackets.
Check the stability by manually moving the brackets to the
toggle bolts
A
A
B
C
A
B
-
Move the side panel slightly to the right and lift it out.
N.B.: Do not disassemble the front panel to avoid
damaging and / or accidentally shifting the upper
battery isolation.
left panel
C
right panel
D
A
B
D
right and to the left, up and down.
Mount the unit, checking that it fits correctly onto the
brackets and checking that it is stable.
N.B .: In order to facilitate the pipe connection to
the fan coil attachments, we recommend installing
a recess box at the outlet of the pipes themselves.
The correct position of the cassette is descriptive
of the installation template, also available on the
website.
brackets
B
A
B
INSTALLATION
EN
23