5-29/32" (15 cm) ±0
6. Prepare the Site - Deck-Mount
NOTE: Provide an access panel under the bath deck for water
supply connections.
NOTE: Reference the "Rough-In - Deck-Mount Installation" section
of this guide before proceeding.
Place the support plate onto the bath deck where the water
supply tubing will be located. (1)
Trace the holes of the support plate at this location to set the
centerline distances for the water supply tubing.
Verify that the location of the support plate will allow the spout
of the bath filler to reach over the bath deck and into the bath. (2)
Verify that the distance between the centerline of the holes on the
support plate will be 5-29/32" (15 cm) ±0. (3)
NOTE: If a hole saw will be used to drill the holes, drill outside the
line of the marked holes.
Drill the marked holes on the bath deck using a 1-9/16" spade
drill bit or 1-1/2" hole saw. Remove any debris from the drilling
process.
Verify the diameter of the drilled holes will accommodate the
diameter of the tubes. Adjust the hole diameter slightly, if needed.
Secure the support plate to the unfinished bath deck with the
eight (provided) wood screws. (4)