Coupling Assembly
Male Copper Connection
Nut
12"
(30.5 cm)
Fiber
Washer
7. Install Spout – Deck-Mount
Thread the tubes into the support plate.
Place a fiber washer and nut over the tubes, both above and
below the deck.
Hand tighten the nuts.
Verify the top of the tube is flush with the surface of the intended
finished deck height.
Securely tighten the nuts with a wrench.
Solder a 1/2" male copper connection (not supplied) to the
outside of a 12" (30.5 cm) section of each water supply line.
Apply thread sealant to each male copper connection.
Securely tighten the coupling assemblies to each male copper
connection.
Connect the supply lines under the deck to the main water
supply.
Insert the plastic pipe plugs into the coupling assemblies.
Turn on the water supply.
Check all connections for leaks. Adjust as needed.
Turn off the water supply, then remove and discard the plastic
pipe plugs.
Finish the bath deck and surround.
1054455-2-E
Plug
Apply thread
sealant.
Solder together.
Water Supply
Tubing
12
Kohler Co.