Finished Wall
2-7/16"
(6.2 cm)
3-3/4"
(9.5 cm)
1. Prepare for the Installation
Provide a 2-7/8" (7.3 cm) to 3-1/8" (7.9 cm) diameter hole in the
wall material for the plaster guard.
2. For All Installations
Route the 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the transfer valve inlet.
1041156-2-A
Plaster
Guard
Mixed water
supply 3/4"
copper tubing
or piping
4
Kohler Co.