Kohler K-687 Manual Del Usuario página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Two-Way Installations
IMPORTANT! Do not plug any outlets on this transfer valve. The
transfer valve is not intended to be used as a shut-off valve. If less
than three accessories will be installed, connect the unused transfer
valve port to one of the accessories. All outlet ports must be
connected to an accessory, even if one accessory is connected to two
transfer valve outlet ports.
Install 1/2" copper tubing or 1/2" piping for both accessories.
Use a tee to connect two of the outlet ports. Securely fasten the
piping and outlet ells to the framing.
Install temporary 1/2" nipples in the outlet ells so they extend a
minimum of 2" (5.1 cm) beyond the planned finished wall.
Turn on the water supply to the transfer valve and check the
transfer valve for proper operation and leakage. Once everything
is verified, turn off the water.
Install caps on the temporary bath and shower nipples. Turn on
the water and check for leaks. Once no leakage is verified, turn
off the water.
Complete the finished wall.
Remove and discard the plaster guard.
Install the trim according to the installation instructions packed
with the trim.
1058930-2-A
Accessory # 1
Water Line
Accessory # 2
Water Line
Mixed water
supply 3/4"
copper tubing
or piping
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido