Assembly Guide - Marshalltown SPNRSSAD Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hole on
end
J
K
M
1.
Lay out all the components of the Spin Screed® Assembly. Note: Pipe sold separately
2. Screw in Handle (A) onto the Power Head (B) on the side of the green trigger.
3. Screw in Handle (C) onto the Power Head (B) on the opposite end of the green trigger.
4. Attach both parts of the Dead-End T-Handle (D) and screw in the handle components (E) (Note: it's best to have
the hole at the end perpendicular to the T-Handle).
5. Take the Small Tool (L) from the Handle (A). Remove the Impact Socket (G) from the Live End by depressing
the spring with the Small Tool. Return the Small Tool to the Handle.
6. Locate the Chuck Key (F) on the body of the Power Head (B). Install the Impact Socket (G) in the Chuck of the
Power Head (M). Tighten with the Chuck Key. When done, return the Chuck Key to its location.
7.
NOTE: Ends (J & I) must be installed in screed pipe before these steps. See next page. Connect the Power
Head (M) to the Live End (J) by depressing the locking pin on the Impact Socket Adapter (G), so it can slide into the
Live End (J).
8. Connect the T-Handle (D) to the Dead End (I) by removing the pin (H), placing the T-Handle through the opening, and
replacing the pin.
6 of 32
104 S. 8th Ave. Marshalltown, IA Phone 800-888-0127 / 641-753-0127 • Fax 800-477-6341 / 641-753-6341 www.MARSHALLTOWN.com

ASSEMBLY GUIDE

Pipe Sold Separately—Several Available Lengths
D
I
H
G
B
F
E
D
E
C
A
L
WS2569

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido