1. Size of BC controller's end connection piping
(Main)BC controller
Sub BC controller
(E)P200 - 350
(E)M200 - 300
(E)P351 - 900
(E)P901 - 1100
BC controller / Main BC controller
Unit model
High pressure side*1 Low pressure side*1
PURY-(E)P200
PQRY-P200
PURY-(E)M200
ø15.88 (Brazing)
PURY-(E)M250
PURY-(E)M300
PURY-(E)P250
PQRY-P250
PURY-(E)P300
ø19.05 (Brazing)
PQRY-P300
PURY-(E)P350
PQRY-P350
PURY-(E)P400
ø22.2 (Brazing)
PQRY-P400
PURY-(E)P450
PQRY-P450
PURY-(E)P550
PQRY-P550
ø22.2*2 (Brazing)
PURY-(E)P600
PQRY-P600
PURY-(E)P650
PURY-(E)P700
PQRY-P700
PURY-(E)P750
PQRY-P750
PURY-(E)P800
ø28.58 (Brazing)
PQRY-P800
PURY-(E)P850
PQRY-P850
PURY-(E)P900
PQRY-P900
PURY-(E)P950
PURY-(E)P1000
PURY-(E)P1050
ø34.93 (Brazing)
PURY-(E)P1100
*1. Use separately sold parts if the pipe diameter is not appropriate.
*2. If the length of high-pressure pipe A exceeds 65 m (213 ft), use the
ø28.58 (ø1-1/8) pipes for all pipes after 65 m (213 ft).
[Fig. 4.1.2] (P.5)
To outdoor unit (Main BC controller)
Ⓐ
Ⓑ
End connection (brazing)
Ⓒ
BC controller (Main BC controller / Sub BC controller)
Ⓓ
Indoor unit
Ⓔ
P/M50 or below
Combined piping kit (Model name: CMY-R160-J1)
Ⓕ
Ⓖ
Twinning pipe (Model name: CMY-Y102SS-G2, CMY-Y102LS-G2)
Ⓗ
Up to three units for 1 branch hole; total capacity: 80 or below
(but same in cooling/heating mode)
The size of BC controller's branch piping is for 63 to 140 type indoor units.
Therefore, if you want to connect indoor units other than the above, connect
piping following the procedures below.
*1. For connecting 15 to 50 model indoor units
Have pipe expansion of indoor unit connecting port by cutting the piping at the
cutting point which depends on the indoor unit capacity.
Note:
Remove burr after cutting the piping to prevent entering the piping.
Check that there is no crack at the pipe expansion part.
14
Available connection (✔ mark : available)
CMB-M104V-J1(-TR)
CMB-M108V-JA1(-TR)
CMB-M106V-J1(-TR)
CMB-M1012V-JA1(-TR)
CMB-M108V-J1(-TR)
CMB-M1016V-JA1(-TR)
CMB-M1012V-J1(-TR)
CMB-M1016V-J1(-TR)
Not available
Not available
✔
ø19.05 (Brazing)
ø22.2 (Brazing)
ø28.58 (Brazing)
ø34.93 (Brazing)
ø28.58 (Brazing)
ø34.93 (Brazing)
ø41.28 (Brazing)
CMB-P1016V-KA1(-TR)
Not available
✔
✔
✔
✔
✔
Total capacity of
High pressure (gas)
indoor units
side *2
200 or less
ø15.88 (Brazing)
201 - 300
ø19.05 (Brazing)
301 - 350
351 - 400
ø22.2 (Brazing)
401 - 600
601 - 650
ø28.58 (Brazing)
651 - 800
801 - 1000
1001 -
ø34.93 (Brazing)
*1. The maximum total capacity of indoor units that can be connected to each Sub BC
controller is P350.
*2. Use separately sold parts if the pipe diameter is not appropriate.
*2. To connect a unit with a capacity of 81 or above.
After combining two branches using an optionally available piping kit
(CMY-R160-J1), connect indoor units.
*3. Connection of plural indoor units with one connection (or joint pipe)
• Total capacity of connectable indoor units: 80 or below (250 or below with joint
pipe)
• Number of connectable indoor units: Maximum 3 Sets
• Twinning pipe: Use the twinning pipe for CITY MULTI Y Series (CMY-Y102SS-
G2, CMY-Y102LS-G2)
• Selection of refrigerant piping
Select the size according to the total capacity of indoor units to be installed
downstream.
Total capacity of indoor units
140 or below
141 to 200
201 to 250
Note:
Be sure to use non-oxidative brazing.
CMB-M108V-JA1(-TR)
CMB-P1016V-KA1(-TR)
CMB-M1012V-JA1(-TR)
CMB-M1016V-JA1(-TR)
CMB-M104V-KB1(-TR)
CMB-M104V-KB1(-TR)
CMB-M108V-KB1(-TR)
CMB-M108V-KB1(-TR)
(Qty. 1 to 11)
(Qty. 1 to 11)
✔
✔
Sub BC controller
Low pressure (gas)
Liquid side *2
side *2
ø19.05 (Brazing)
ø9.52 (Brazing)
ø22.2 (Brazing)
ø12.7 (Brazing)
ø28.58 (Brazing)
ø15.88 (Brazing)
ø34.93 (Brazing)
ø19.05 (Brazing)
ø41.28 (Brazing)
Liquid line
ø9.52
✔
✔
✔
Gas line
ø15.88
ø19.05
ø22.2