Technical Data; Equipment / Accessories; Start-Up; Setting Solid And Semitubular Rivets - Gesipa TAURUS 4 CF Manual De Instrucciones Con Llista De Repuestos

Remachadora neumática
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.

Technical data

Tool type
Weight (kg)
Operating pressure (bar)
Stroke (mm)
Hose connection Ø (1/4") (mm)
Setting force at 5 bar (N)
Hydraulic oil, Renolin Eterna 32 (ml)
Noise emission Lpa (dB),
Measurement uncertainty K=3dB
Vibration (m/s²),
Measurement uncertainty K=1,5 m/s²
4.

Equipment / accessories

Tool type
1 bottle of hydraulic oil 100 ml (1445294)
1 oil refill can (1435687)
Rubber foot (1435900)
5.

Start-up

Before starting the rivet setting tool, read and observe the operating instructions and safety
information and keep in a safeplace.
Have technical personnel connect the compressed air supply to the processing tool.
Mount riveting or press-fitting tools including spacers
Adjust stroke and grip length with aid of stroke limiter (No. 6) and setscrew (No. 7)
5.1

Setting solid and semitubular rivets

Connect the processing tool to the compressed air supply
Insert the rivet into the component
Fit C-frame on setting head side and align on bulb side
Keep trigger pressed until the setting process is complete
Release trigger
TAURUS
4 CF
®
2,0
5-7
19
6
23.000
30
79
<2,5
TAURUS
4 CF
®
GB
15

Publicidad

Tabla de contenido
loading

Tabla de contenido