Kohler Sterling 402040 Guia De Instalacion página 5

Ocultar thumbs Ver también para Sterling 402040:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
Template
2
3/8"
3. Mark the Installation Location
Position the installation template (1) over the waste outlet.
Carefully tape the template in place.
Drill two 3/8" holes (2) at the spots designated on the template.
Insert anchors (3) in the drilled holes.
Position a bracket (4) over each hole, with 1/4" (6 mm) between
the bracket and the bowl line on the template.
Secure the brackets with the supplied screws.
Sterling
3
3/8" NPT
Supply
11-13/16"
(30 cm)
Anchor
4
1/4" (6 mm)
5
6-1/2"
(16.5 cm)
1/4"
(6 mm)
1058763-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido