Preparation; Initial Start-Up And Longer Breaks In Use; Prior To Starting The Work Day; Before Each Patient - B.A. International BA ULTIMATE POWER+ Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 143
6556042.book Seite 20 Freitag, 15. April 2016 3:13 15
4 Preparation
20
4

Preparation

4.1

Initial start-up and longer breaks in use

✔ The turbine is only able to reach full power if indicated operating
Turbine
pressures are set [ → 15]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2

Prior to starting the work day

➢ Purge the water and air channels for 30 seconds.
4.3

Before each patient

1. Purge the water and air channels for 30 seconds.
Preparation _ Turbine
2. Attach the turbine [ → 22].
Operating Instructions BA ULTIMATE POWER+
65 56 042 D3560.201.08.02.02

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ba 755Ba 758

Tabla de contenido