Complete The Installation - Kohler K-110 Guia De Instalacion

Ocultar thumbs Ver también para K-110:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Washer
Stem
Extension
Bonnet
Bath
Adapter
Handle Arm
12. Multi-Piece Lever Handle Installation
NOTICE: Risk of product damage. Do not overtighten.
Overtightening will damage the handle.
Verify that the valves are in the closed position.
Install the stem extension to the valve stem.
Thread the bonnet onto the valve body.
Align the bath adapter over the stem extension so the holes line
up horizontally. Secure with the screw.
Install the skirt cap to the end of the bath adapter.
Slide the long sleeve, then the O-ring onto the handle arm.
Insert the handle arm through the bath adapter.
Slide the short sleeve, then the washer onto the handle arm.
Thread the end cap onto the end of the handle arm to secure the
assembly.
Repeat for the other handle.

13. Complete the Installation

Open the supplies.
Turn on the hot and cold water.
Run water through both the handshower and the faucet.
Check for leaks.
Kohler Co.
Endcap
Short Sleeve
Screw
Skirt Cap
O-Ring
Long Sleeve
Hot
Cold
Open
Shown In Closed Position
15
Open
1008209-2-H

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-331K-6905K-16210

Tabla de contenido