Mounting
Stud
Mounting
Frame
Pencil
Line
5. Install Plumbing
CAUTION: Risk of damage to the footbath bottom and subfloor. Ensure a watertight seal on the
footbath drain connections.
When the footbath is securely positioned, connect and leak test the drain and fittings. Make sure to
plug the suction line if the pump is not yet attached.
NOTE: An access panel will simplify future maintenance.
6. Tower Mounting Frame Preparation
The location of the tower mounting frame is critical. Be precise with this measurement.
Measure 2-3/8" (6 cm) from the deck surface of the footbath to the tower mounting stud. Draw a
pencil line at that location.
7. Install the Tower Mounting Frame
Remove the three 3/8" tower bolts and carefully lift the tower out of the mounting frame. Carefully
set the tower aside where it will not be damaged.
Position and level the mounting frame between the tower mounting studs and align the bottom
metal edge with the pencil line you drew on one of the studs.
Secure the mounting frame to the tower mounting studs with the 10 provided drywall screws.
1032118-2-D
Stainless
Steel Drywall
Screw
2-3/8" (6 cm)
8
Bolts
Bolt
Kohler Co.