Installation - Leggett & Platt PREMIER FOUNDATION DESIGN Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

For installation and setup, complete the following procedures, in the order indicated below
and on the following pages:
STEP 1
Before discarding any packing materials,
check the adjustable base shipping carton
and verify the following items are
included:
• (1) Mattress Retainer
• (1) Remote Control
• (4) Bed Legs
• (2) Headboard Bracket Assemblies
according to base type)
• (1) Headboard Bracket Hardware Kit
• (1) Power Cord
• (1) Power Supply Brick
• (1) Bedroom Accessory Control
• (1) Dual Sync Cable
• (1) Warranty Activation Card
• (1) Quick Setup Guide
MATTRESS
RETAINER
(1 per base)
(2) Bracket Weldments*
HEADBOARD BRACKET ASSEMBLIES - HARDWARE
*Varies according to base type. Furniture Design shown.
(4 bracket pieces, hardware blister card)
8
Premier Series
Owners Manual 99301588-b
(varies according to base type)
(varies
(split size bases only)
REMOTE CONTROL
(2) Flange Weldments*
Blister Card

INSTALLATION

BEDROOM ACCESSORY
BEDROOM ACCESSORY
CONTROL
(blister card)
QUICK SETUP GUIDE
DUAL SYNC CABLE
split size bases only
POWER SUPPLY
POWER SUPPLY
POWER CORD
POWER CORD
WARRANTY
ACTIVATION CARD
5/16-18 Threads
M-8 Threads
WOOD
Furniture Design* Foundation Design*
LEG
(4 pieces)
*Varies according to base type:
Either Square Wood Leg or Steel Leg.
Steel Leg not compatible with Furniture
Design.
BRICK
STEEL

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Premier furniture design

Tabla de contenido