9
Pop out the first wiring access slug. Use second if needed.
New Construction
A11
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
41938-01 3/29/2006
05-HF-024_EngS_3.29.06.indd 5
Choose Installation Option
For New Construction go to step A11, page 5
For Existing Construction go to step B11, page 8
5/8
1/2
10
E
Insert the strain relief (not included) into the housing and
A12
E
5/8
1/2
Screw pre-loaded screws into joist or framing.
C
B
secure with washer.
5
3/29/06 7:25:19 PM