Steelcase 1041259001 Instrucciones De Ensamblaje página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
Modular Power System Installation
Risk of Fire or Electric Shock
1. For use in indoor, dry locations only.
2. Review the assembly instructions to confirm that the appropriate critical components
and accessories are being used with the furnishing
3. Only connect to products labeled "Modular Power System" by Steelcase.
4. Do not modify or strain cables. If damaged, remove from service immediately.
5. Disconnect modular electrical connections before servicing or reconfiguring tables.
6. Tables must be held together with ganging hardware as described in this document,
and NOT held together solely by electrical components.
7. Cable clamps must be no more than 12" from modular cable end connector or receptacle.
Ganging Hardware
Flex Gangers
Field installed Flex Gangers are required when Modular Power System is installed.
They are used to easily link adjacent tables in multiple configurations. The flexible loop
engages a hook to hold the tables in place. No tools are required to stretch the loop across
the seam to the hook on the adjacent table.
Electrical Circuits
The modular power kit is a non-sequential power system that allows up to 8 power/data centers,
each with 3 receptacles, from a single 15 Amp cord. The power system includes LED indicators
that illuminate green when properly connected. A red light indicates there are too many
power/data centers connected.
Risk of Fire or Electric Shock
Note: all electrical installations must be reviewed with the local authority for
compliance with local code, and must be performed by a qualified person in
accordance with codes and regulations applicable at the installation site.
WARNING
WARNING
12" MAX.
CABLE
LENGTH
12" MAX.
6" MAX.
Part # 1041259001
Doc # 93675 Rev F
Page 2 of 31

Publicidad

Tabla de contenido
loading

Tabla de contenido