Display And Operating Elements; Functional Description - Gebhardt Anlagentechnik BBF1G Traducción Del Manual De Instrucciones Original

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.1.2

Display and operating elements

12. Display of the scales
13. Button TARE
4.2

Functional description

The buffer tank (1) is filled with the medium to be bagged through the inflow tap (3). The level
display (2) shows the fill level of the buffer tank (1).
The Bag-in-Box bag (3 l / 5 l / 10 l) is placed on the bag support (10) and clamped into the bag holder
(9). The bag seal must be opened manually. Keep the bag seal in your hand during the filling
process. The filler hose (5) is inserted into the opening of the Bag-in-Box bag. Now the Bag-in-Box
bag is filled using the filler tap (4) and the scales (8) are used to determine the weight. Once the
required fill level has been reached, the Bag-in-Box bag can be sealed again and then removed.
Original operating manual Bag-in-Box Filler BBF1G
13.08.2020
12
Set-up and function
13
14
14. Button ON/OFF
36 of 90
English

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para Gebhardt Anlagentechnik BBF1G

Tabla de contenido