8
Operation
8.1
Safety
See Chapter 2 Safety.
8.2
Operating modes
-
Manual mode
8.3
Taking into operation
8.3.1
Start-up after a scheduled shut-down
Before any start-up or after longer periods of decommissioning of the machine, the following
procedure must be followed:
-
Check general condition.
-
Ensure that the necessary servicing (see Maintenance) has been carried out.
Before you can take the BBF1G into operation, you will require the following:
-
Safety socket 230 V AC 50 Hz fused 16 A
For commissioning, follow this procedure:
-
Connect the upstream pump with a hose to the inflow tap (3)using the NW 25 screwed
connection.
-
Plug the AC-adapter of the scales (8) into the safety socket 230 V AC 50 Hz and connect the
other end with the scales (8).
-
Switch the scales (8) on, using the ON/OFF button (14).
-
Place a Bag-in-Box bag on the bag support (10).
-
Tare the scales (8) using the button TARE (13).
-
Connect the filler tap (4)
-
Open the inflow tap (3)
-
Now production can commence.
Original operating manual Bag-in-Box Filler BBF1G
13.08.2020
Operation
40 of 90
English