Prepare The Opening - GE Advantium PSB1000 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para Advantium PSB1000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARE THE OPENING

The Advantium 120 can be installed in combination
with other GE appliances. Always follow each
product's Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
Order a 27"-wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
27"
17-1/2"
36-3/4"
Min.
• Always maintain 36-3/4" minimum height from
the floor to the cutout in any single or combined
installation.
• Allow 1-1/4" case trim overlap at the top and 7/8"
overlap on the bottom and each side of the
opening.
• Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
Construct a solid oven floor of 3/8" min. thick
plywood supported by 2 x 4 runners on all sides.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
Installation Preparation
23-1/2"
25-1/8"
Construct
Base
Min. 3/8"
Plywood
Supported
by 2 x 4
or 1 x 2
Runners all
Four Sides
PREPARE THE OPENING
Installation over a GE Warming Drawer:
27"
17-1/2"
9-1/4"
36-3/4"
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
5
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by 2 x 4 or
25-1/8"
1 x 2 Runners
all Four Sides
2" Min.
Install 2 x 4 or
2 x 2 Runners
or Solid Bottom.
Must Support
100 lbs.

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Advantium psv1001 seriePsb1000wwPsb1000bbPsb1001ss

Tabla de contenido