Product Dimensions And Clearances; Tools And Parts Required; Preparing The Opening (Standard); Preparing The Opening (Flush Mount) - GE Advantium Café Min CSB912M2NS5 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PRODUCT DIMENSIONS AND CLEARANCES

21-1/2
2-1/4
1

TOOLS AND PARTS REQUIRED

)
(NOT SUPPLIED
• #2 Phillips screwdriver
• Hand-held drill
• High speed drill bit, 3/32 diameter
• 3/8 slot-head screwdriver
• Level
• Saw
• 3/8" slot-head screwdriver
• Wood screws or other hardware for installing •
runner or shelf to support oven (if required)
• Safety glasses or goggles
FLUSH MOUNT INSTALLATION
This installation method allows for the unit face to
be inline with the cabinet face.
IMPORTANT: HIGH SKILL LEVEL IN
CARPENTRY IS REQUIRED. Non-standard
cabinetry may be required.
Flush installation of the oven will lead to the
exposure of the cabinet face frame edges.
Side cleats may be visible and should be a
finished surface.
31-2000355 Rev.1
Design Information
13 1/4
1-1/4
26-3/4"
ADVANCE PLANNING
wide oven cabinet with standard installation.
• Cutout height dimensions are different for
installations with an accessory storage drawer.
Make sure to use the correct cutout when
preparing the opening.
• Allow for clearance to adjacent corners, walls,
drawers, etc.
The oven must be securely installed in a cabinet
that is firmly attached to the house structure.
Weight on the oven door could cause the oven
to tip and result in injury. Never allow anyone to
climb, sit, stand or hang on the oven door.
If installing the drawer accessory, the drawer
must be assembled to the oven prior to
installation into the cabinet. See the Accessory
Storage Drawer Assembly Instructions.
20-1/8"
3

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Advantium café pro csb912p2ns1

Tabla de contenido