Valance Installation - Levolor Natural Shades Instalación

Ocultar thumbs Ver también para Natural Shades:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLING ADDITIONAL COMPONENTS
INSTALL VALANCE
Be sure to complete motorization set-up before installing the valance.
WOOD VALANCE:
Hook the top of the valance over the top lip of the headrail.
Carefully press the valance down and back against the headrail until the valance
clips into place.
WOOD VALANCE RETURNS (outside mount only)
Insert the clips into the groove on the back side of the valance and then rotate
the clip 90°.
Insert return clips as far as they will go into each end of the valance.
Align the return clips with the slots on the headrail and slide into place.
CLASSIC VALANCE
Hook the top of the valance over the top lip of the headrail.
Return clip
Carefully press the valance down and back against the headrail until the valance
clips into place.
Hook-and-loop strips
22
Battery-Powered Motorized Operating System
Return clip
Valance
Hook-and-loop strips
Valance return
Return clip
Return clip
Valance

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Levolor Natural Shades

Tabla de contenido